8/19/22 - Bathroom Drywall
There are many things that happen in between the posts and choosing the highlights can be challenging. So much happens every day, and everything is a process. We got to work on the walls of the main bathroom. Before we install the toilet the floor tile should be done. Before we lay tile the heating element needs to be laid. Before the floor work happens the walls need to be mudded, sanded and textured. So, we start with the walls.
And our goats are occasionally getting into something that disagrees with them. Pepto Bismol is the solution, but they don’t make it easy.