1/20/23 - West Room

Upstairs each of the rooms and spaces is going to take special attention. And the work in each is a bit different. While the south room needed texturing on the walls and flooring, the west room needs drywall, insulation, staining of the accent wall and sealing up of the crawlspaces on each side. The east room is where the half-bath will be so there is wall work, flooring and plumbing to do. The south room is nearly done, just a little trim work left, so we move on to the other rooms.

The goats have cleared enough by the house that they need to hike up on the hill to get to good grazing space, but they are reluctant to go alone. So, I have started taking a little hike with them as often as I can.